The tray ceiling in the master bedroom.
Sunday, December 16, 2007
Slowly but surely...
First off, I hope everyone enjoys these pictures. There were taken in 30 degree weather and flurries (plus a WHOLE lot of mud) just so you guys could stay updated. The roof has gone a little slow this week due to some rain. The plumbing should be done this week, and the electrical work will start this week. Greg, our builder, and I walked the house on Friday to decide where outlets, switches, cable, phone, etc. should go. They also came to measure the house for brick so our order could be placed. Gravel had to be spread on the driveway in preparation of this. So things are moving forward, slowly, but they are moving. Things are going to be slowing down even more as we enter January and February, but Greg says that is to be expected.
Plumbing in the laundry room.
The wall in the keeping room where the fridge will go.
Done with shingles on the back of the house, starting on the side.
Fireplace is framed, and the gas logs are in.
Patio door and windows with built-in shades.
The front door.
Guest bathroom, site of the future sink.
Master bath shower.

Subscribe to:
Post Comments (Atom)
1 comment:
We do appreciate the pictures. We cannot wait until Christmas so we can see it for ourselves. We are so proud of you guys and all that you are doing. It will be great!
Post a Comment